Enviroparks planning applications were approved by Rhondda Cynon Taf County Borough Council on 18th October 2017 and by Brecon Beacons National Park Authority on 23rd October 2017.
Hard copies of the planning application documents are available in Hirwaun Library.
Alternatively, planning documents can be viewed through the links below:
2017 Application Documents
- Further Environmental and Supporting Information September 2017
-
Contents
- Revised Application Plans 2017
- Proposed Site Plan (Ref. 6011 Rev P9)
-
Proposed Roof Plan (Ref. 6013 Rev P5)
-
Proposed Elevations (Ref. 6014 Rev P4)
- Proposed Plant Elevations (Ref. 6015 Rev P4)
-
Proposed Site Sections (Ref. 6019 Rev P1)
- Shadow Habitat Regulation Assessment
-
Enviroparks Dispersion Modelling Assessment
- Health Impact Assessment
- Revised Environmental Statement Addendum chapter 12: Landscape and Visual Effects
- Further Environmental and Supporting Information August 2017
- Contents
- HRA
- sHRA Screening Report Rev_A (Issue 3) - Appendix 1
- sHRA Screening Report Rev_A (Issue 3) - Appendix 2
- sHRA Screening Report Rev_A (Issue 3) - Appendix 3
- sHRA Screening Report Rev_A (Issue 3) - Appendix 4
- sHRA Screening Report Rev_A (Issue 3) - Appendix 5
- sHRA Screening Report Rev_A (Issue 3) - Main Report and Drawing
- Dispersion Modelling
- Health Impact Assessment
- Drainage
- Further Environmental and Supporting Information May 2017
- Shadow Habitat Regulation Assessment: Stage 1 Screening Report, May 2017
- Dispersion Modelling Report Addendum Issue 1 May 2017
- Proposed Phasing Site Plan
- Wildlife Protection Plan inc. Reptile Strategy_Feb 2017
- Arboricultural Survey_Feb 2017
- Completion of Mitigation Works_Oct 2016
- Landscape Strategy Plan
- Proposed Overall Site Layout
- 1_SUDS Strategy
- 2_Proposed Drainage Layout
- 3_Existing surface water runoff rates
- 4_Enviroparks Phase 2 Impermeable Areas
- 5_Revision to Surface Water Drainage Model
- 6_Attenuation Pond Proposals
- 7_Construction Details (Sheet 2 of 4)
- 8_Construction Details (Sheet 3 of 4)
- Supplementary Soil Sampling, Ref_LQ80023G001
- Supplementary Groundwater Sampling, Ref_LQ80023G002
- Geo-environmental Assessment Report, Ref_RQ80023G001B
- Enviroparks Construction Method Statement
- Enviroparks Construction Method Statement Appendix A
- Enviroparks Construction Method Statement Appendix B
- External Lighting Report
- External Lighting Lux Plot Layout Plan
- Foundation Proposals (Piling) Report
- 6032 Fencing plan
- Pro-Sure Mesh Panel
- Existing Site Survey (May 2008)
- Proposed Site Levels (28 April 2017)
February 2017 Application Documents
- Design and Access Statement 2017
- Covering Letters
- Application Forms 2017
- Location Plan 2017
-
Application Plans and Drawings 2017
- Existing FPA Proposed External Alterations (Ref. 6016 Rev P2)
- Proposed Elevations (Ref. 6014 Rev P2)
- Proposed Plan Layout (Ref. 6012 Rev P5)
- Proposed Plant Elevations (Ref. 6015 Rev P3)
- Proposed Roof Plan (Ref. 6013 Rev P3)
- Proposed Site Plan (Ref. 6011 Rev P7)
- Proposed Site Sections (Ref. 6019 Rev P0)
- 3D visualisations 2017
- Pre-application Consultation Report
- 2017 Environmental Statement Addendum, figures and appendices (including landscape figures and visualisations)
- ES Addendums 2017
- 01_Contents
- Ch. 1_Introduction
- Ch. 2_Site Description
- Ch. 3_Proposed Development
- Ch. 4_Site Selection
- Ch. 5_Policy Context
- Ch. 6_Scoping
- Ch. 7_Community Effects
- Ch. 8_Transport
- Ch. 9_Air Quality
- Ch. 10_Noise
- Ch. 11_Ground Conditions
- Ch. 12_Landscape
- Ch. 13_Ecology
- Ch. 14_Cultural Heritage
- Ch. 15_Conclusion
- Figures 2017
- Landscape and Visual Figures 2017
- 01_Contents
- Viewpoint Locations Fig 12.1_FINAL
- Visualisation Aa_FINAL
- Visualisation Ba_FINAL
- Visualisation Bb_FINAL
- Visualisation Bc_FINAL
- Visualisation Ca_FINAL
- Visualisation Cb_FINAL
- Visualisation Cc_FINAL
- Visualisation Da_FINAL
- Visualisation Db_FINAL
- Visualisation Ea_FINAL
- Visualisation Eb_FINAL
- Visualisation Fa_FINAL
- Visualisation Fb_FINAL
- Visualisation Ga_FINAL
- Visualisation Gb_FINAL
- Visualisation Ha_FINAL
- Visualisation Hb_FINAL
- Visualisation Hc_FINAL
- Visualisation Hd_FINAL
- Visualisation Ia_FINAL
- Visualisation Ib_FINAL
- Visualisation Ja_FINAL
- Visualisation Jb_FINAL
- Visualisation Jc_FINAL
- Visualisation Jd_FINAL
- Visualisation Ka_FINAL
- Visualisation Kb_FINAL
- Visualisation La_FINAL
- Visualisation Lb_FINAL
- Visualisation Ma_FINAL
- Visualisation Mb_FINAL
- Visualisation Mc_FINAL
- Visualisation Na_FINAL
- Visualisation Nb_FINAL
- Visualisation Nc_FINAL
- ES Appendices 2017
- 8. Transport
- 9. Air Quality
- 10. Noise
- 11. Ground Conditions
- Appendix 11.1 (part 1 of 4)
- Appendix 11.1 (part 2 of 4)
- Appendix 11.1 (part 3 of 4)
- Appendix 11.1 (part 4 of 4)
- Appendix 11.2
- Appendix 11.3
- Appendix 11.4
- 12. Landscape
- 2017 Non-Technical Summary
- Granted Permission 2010 Layout
- Application Plans 2017
- Existing FPA Proposed External Alterations (Ref. 6016 Rev P2)
- Proposed Elevations (Ref. 6014 Rev P2)
- Proposed Plan Layout (Ref. 6012 Rev P5)
- Proposed Plant Elevations (Ref. 6015 Rev P3)
- Proposed Roof Plan (Ref. 6013 Rev P3)
- Proposed Site Plan (Ref. 6011 Rev P7)
- Proposed Site Sections (Ref. 6019 Rev P0)
- Site Location Plan (Ref. 6017 Rev P1
- 0a Contents
- 0b Enviroparks Introduction
- 1a Additional Information - 05.09
- 1b Site investigation - 01.09
- 1c Explanatory notes for engine releases and acid deposition
- 2a Appropriate Assessment - Stage 1 screening - 04.09
- 2b Assessment for SSSIs within 10km - 05.09
- 3a Risk Assessment for Penderyn reservoir - 05_09
- 3b Welsh Water risk assesment proforma - 05.09
- 4a Health Risk Assessment - 30.04.09
- 4b Dioxin Health Risk Assessment - 30.11.08
- 5a Waste resource paper- 04.09
- 5b Regional waste facilities paper- 05.09
- 6 Road Safety Audit - 11.08
- 7a BREEAM - Gatehouse & Visitor Centre - 28.10.08
- 7b BREEAM - Biomax Unit - 28.10.08
- 7c BREEAM - Engine House & Fuel Preparation - 28.10.08
- 8a DWG 8016_PL_003 rev G Proposed Site Plan
- 8b DWG 8016_PL_090 Green Wall Details - 04.09
- Covering letters to RCTCBC & BBNPA
- Chapters 2008
-
Figures 2008
- Appendices 2008
- Archaeology 2008
- Ecology 2008
- Ground Conditions 2008
-
Chapter 11 App 1 1972 SI
-
Chapter 11 App 2 1995 July Report
-
Chapter 11 App 2 Fig 1
-
Chapter 11 App 2 Fig 2
-
Chapter 11 App 2 Fig 3
-
Chapter 11 App 3 1995 Sept report
-
Chapter 11 App 4 Summary of Works
-
Chapter 11 App 5 2007 Phase 1 Report
-
Chapter 11 App 6a 2008 SI Plan
-
Chapter 11 App 6b 2008 Trial Pit Log
-
Chapter 11 App 6c Borehole Log
-
Chapter 11 App 6d Soil analysis
-
Chapter 11 App 7 Flood Risk Assessment
-
Chapter 11 App 8a Trade Effluent
-
Chapter 11 App 8b Welsh Water
-
Chapter 11 App 9
- Chapter Appendix divider pages
- Landscape and Visual 2008
- Chp 12 App 3 CCW Landmap Methodology
- Chp 12 App 4 CCW Landmap Technical Reports
- Chp 12 App 7 VS Aspect Areas data forms
-
01 - Cynon - Cadair Fawr
-
02 - Cynon - Penderyn
-
03 - Cynon - Aberdare
-
04 - Cynon - Opencast
-
05 - CynonVS430
-
06 - Cynon - St Gwynno
-
07 - CynonVS890
-
08 - BRCKNVS876
-
09 - BRCKNVS911
-
10 - BRCKNVS597
-
11 - NPTVS430
-
12 - NPTVS962
-
Chapter 12 App 1
-
Chapter 12 App 2
-
Chapter 12 App 5
-
Chapter 12 App 6 BBNP UDP Appendix 3
-
Chapter 12 App 8
-
Chapter 12 App 9
-
Chapter 12 App 10
-
Fig 12.1 - 12.4
-
Fig 12.1 - 12.7
-
Fig 12.5 - 12.7
- Fig 12.8 - 12.22